SHIFT STATUS
BORNEO
OILFIELD
SERVICES
Call-out crew untuk wellsite, pipeline, skid fabrication, dan HSE standby. Kirim lokasi, scope, PTW requirement, dan jam mobilisasi.
CREW READY
24H
CALL-OUT
0
LTI 2024
180
MANPOWER
ASME
WPS/PQR
P&ID SKID / FLOW LOOP 07
Pressure, pipe, permit.
HOT WORK REVIEW
WELLSITE
Wellhead check, valve greasing, pumping support, gauge replacement, and annual maintenance crew.
PIPELINE
Flange tightening, leak response, pipe spool replacement, coating repair, and pressure test support.
FABRICATION
Skid frame, pipe rack, manifold, spool, welding pack, fit-up, NDT coordination, and site installation.
PERMIT TO WORK
PTW / ISOLATION / TOOLBOX
Hot work, confined space, lifting, electrical isolation, and line break jobs are checked before crew mobilizes.
HANDOVER NOTES
- Pressure source isolated before flange work.
- Gas test required before hot work.
- Standby medic and fire watch on request.
- Photo report sent after shift close.

SHIFT HANDOVER ROOM
CALL-OUT WINDOW OPEN · WELLHEAD · PIPELINE · SKID FAB · HSE STANDBY · PTW SUPPORT · NDT COORDINATION · TORQUEING · PRESSURE TEST ·



SEND BEFORE MOBILIZATION
01 Lokasi sumur / station / pipeline KP.
02 Scope kerja dan status PTW.
03 Pressure, line content, isolation plan.
04 Required crew: welder, fitter, rigger, HSE, medic.
05 Jam standby dan akses mobilisasi.
24H CALL-OUT
Kirim work order. Kami cek crew, PTW, tools, dan ETA mobilisasi.
Untuk emergency leak, shutdown support, wellhead job, atau fabrication rush order, tulis “URGENT” di WhatsApp dan lampirkan foto lokasi.
SEND URGENT REQUEST