SHIFT STATUS

BORNEO
OILFIELD
SERVICES

Call-out crew untuk wellsite, pipeline, skid fabrication, dan HSE standby. Kirim lokasi, scope, PTW requirement, dan jam mobilisasi.

CREW READY
24H
CALL-OUT
0
LTI 2024
180
MANPOWER
ASME
WPS/PQR
SEND WORK ORDER
P&ID SKID / FLOW LOOP 07
Pressure, pipe, permit.
PTW-184WELLSITE SUPPORT / PIPELINE MAINTENANCE / SKID FABSEPARATORESDPUMP
WELLSITE

Wellhead check, valve greasing, pumping support, gauge replacement, and annual maintenance crew.

PIPELINE

Flange tightening, leak response, pipe spool replacement, coating repair, and pressure test support.

FABRICATION

Skid frame, pipe rack, manifold, spool, welding pack, fit-up, NDT coordination, and site installation.

PERMIT TO WORK
PTW / ISOLATION / TOOLBOX
Hot work, confined space, lifting, electrical isolation, and line break jobs are checked before crew mobilizes.
HANDOVER NOTES
  • Pressure source isolated before flange work.
  • Gas test required before hot work.
  • Standby medic and fire watch on request.
  • Photo report sent after shift close.
Control room shift handover
SHIFT HANDOVER ROOM
CALL-OUT WINDOW OPEN · WELLHEAD · PIPELINE · SKID FAB · HSE STANDBY · PTW SUPPORT · NDT COORDINATION · TORQUEING · PRESSURE TEST ·
Wellsite crew
WELLSITE CREW / CHRISTMAS TREE SUPPORT
Pipeline maintenance
PIPELINE FLANGE
Skid fabrication
SKID FABRICATION
Industrial pipes
PIPEWORK
Industrial maintenance
FIELD SUPPORT
SEND BEFORE MOBILIZATION
01 Lokasi sumur / station / pipeline KP.
02 Scope kerja dan status PTW.
03 Pressure, line content, isolation plan.
04 Required crew: welder, fitter, rigger, HSE, medic.
05 Jam standby dan akses mobilisasi.
WHATSAPP OPERATIONS
24H CALL-OUT

Kirim work order. Kami cek crew, PTW, tools, dan ETA mobilisasi.

Untuk emergency leak, shutdown support, wellhead job, atau fabrication rush order, tulis “URGENT” di WhatsApp dan lampirkan foto lokasi.

SEND URGENT REQUEST